Building with combined forces
Thanks to the combined forces of your employees, you will tackle a construction project of your own and realize a full life-size structure to accomplish the mission entrusted to you: Maneuver a load from point A to point B without touching it.
Communication, co-responsibility, and mutual trust will be your best allies on this mission, and your creative collaborators with keen powers of observation and a sense of initiative will be your best friends. Resource optimization and smart planning are essential, because this is about much more than muscle power!
Targets
- To carry out a project in full life size.
- Achieve a common goal thanks to the combined efforts of each.
- Optimize the performance and efficiency of the group.
Possible procedure
14.00: Welcome and introduction
14.15: Group formation - and off we go!
16.45: End of the event
Size of group
15 to 200 people
Duration
2-3 h
Implementation
May till October
Location
Canton of Bern and Western Switzerland
Languages
German, French, English
Costs [CHF] |
incl. 8.1% VAT | |
15 - 19 pers. | 2'400.00 | |
from 20 pers. | 120.00 | |
Travel costs per km | ||
(Personnel and material) | 1.00 | |
Included in the price |
||
- | Organization and implementation | |
- | Professional support/animation | |
- | All the necessary material (wood, tools, nails, etc.) | |
Not included |
||
- | Possible space rental | |
- | Outward and return journey |